Scroll left
  • The renovation site.  The Belt Line Railroad building located on Serman Street across from the Windriver parking lot and the Del Monte warehouse.  The Central Self Storage seen in the background was a major donor of funding for the restoration. width:640;;height:201
  • Before renovation.  Seen from Sherman Street width:640;;height:203
  • Before renovation.  West side seen only from inside the park. width:640;;height:179
  • North side before renovation. width:640;;height:478
  • South side before renovation. width:640;;height:478
  • Section between the two larger ends.  Seen from Sherman Street. width:450;;height:300
  • The exterior renovation of the Belt Line Railroad building was a Spring 2013 community project of the Church of Christ Latter Day Saints.  width:500;;height:333
  • Work groups getting started. width:450;;height:300
  • The frist project was to clean debris in the area around the job site so there was a safe, clean space to work.  width:450;;height:300
  • Volunteer workers cleaning weeds from the job site. width:500;;height:333
  • Jim Sweeney, Jean Sweeney Open Space Park Fund Co-Charman, is working hard at the site. width:383;;height:480
  • The debris pile is getting higher. width:500;;height:333
  • Volunteer workers cleaning more weeds from the work site. width:500;;height:333
  • Volunteer workers cleaning more weeds from the work site. width:500;;height:333
  • The work area now cleaned, it's time to work on the building. width:500;;height:333
  • The old paint has been scraped away and the broken windows are being covered with plywood for now. width:320;;height:480
  • Window coverings have to be custom cut to fit the broken windows. width:500;;height:333
  • Debris is being cleared from the North East corner. width:500;;height:333
  • The old paint has been scrapped off.  Dry rotted boards around the bottom are being replaced.  Covering on the windows is going up. width:500;;height:333
  • Grafitti and old paint has to be removed before the new painting can begin. width:500;;height:333
  • Scrapping off old paint and grafitti is hard work. width:500;;height:333
  • Scrapping paint along Sherman Street. width:500;;height:333
  • Spray painting the cleaned walls. width:320;;height:480
  • Looking good! width:320;;height:480
  • Painting is progressing. width:500;;height:333
  • Top edges have to be painted too. width:500;;height:333
  • Finishing the trim. width:500;;height:333
  • What a different look to drivers on Sherman Street. width:640;;height:359
  • A much nicer view from inside the park looking East toward the Del Monte warehouse. width:640;;height:359
  • A new look to the West side inside the park.  The bare spot in the roof has also been repaired. width:640;;height:359
  • A new look for the North end. width:640;;height:350
  • A new look with flowers in the windows is seen on the South Side driving North on Sherman Street. width:640;;height:351
  • South side along Sherman Street presents a resstored view. width:640;;height:269
  • Putting on the finnishing touches.          width:640;;height:347
  • Work site sure looks a lot better.  Weeds and rebish are gone and the walls are painted. width:450;;height:300
Scroll right